Piston pre-assembly

Product

Piston and conrod in different variants

Equipment

Partially automated pre-assembly station with part carrier system on 2 levels, automated stations and manual working stations

Processes

  • Snap ring assembly
  • Functional inspection/availability and position inspections
  • Piston pin assembly

Cycle time

 40 sec.