Options in functions:
Optional inspections of:
Features:
Effects:
The work station for stack assembly can be adapted to different stack designs and offered in different levels.
Duration: From January 2010 to June 2011, conducted by the FIX Maschinen-bau GmbH company in cooperation with the Centre for Fuel Cell Technology ZBT Duisburg.
This project received financial support from the Federal Ministry for Economic Affairs and Energy (BMWi).